Turbine Isolation Dampers

  • Sizes to 25' x 25' and Up
  • Zero Leakage Isolation of Turbine at +/- 15 psi
  • No Additional Pressure Drop Through Extension Neck
  • No Air Leakage to Steam Side
  • Fully Automated Operation
  • Complete Worker Safety
  • Lower Capital Cost


ECOLAIRE continues to pioneer in the condenser market by offering reliable solutions as cycle requirements evolve. In many combined cycle, cogeneration and refuse-recovery plants there is a requirement to operate the boiler while simultaneously performing maintenance on the steam turbine.

Traditionally this has been accomplished with a separate dump condenser. The method is costly in both equipment and space and can be fraught with control and operational problems.

ECOLAIRE has developed a zero-leakage turbine isolation damper that will allow the main condenser to accept the steam from the operating boiler, thus eliminating the dump condenser and attendant systems. The isolation damper is located in the condenser extension neck and with automatic operation allows complete isolation typically within 10 minutes or less.


  This 10'2" diameter damper will isolate a 60 MW turbine from a 35,945 square-foot condenser in a combined cycle cogeneration facility. The damper is fabricated as a separate unit for installation within the extension neck of this axial exhaust turbine. The damper is fully automated and has been factory assembled and tested for zero leakage and minus 15 psi differential.

The Steam Turbine Isolation Damper can also be utilized in peak load applications when process steam is required while the steam turbine is off-line. The isolation damper maintains vacuum in the condenser during overnight shutdown providing the following benefits:

  • conservation of auxillary boiler steam strictly for process steam supply (eliminates need for steam supply to the steam turbine gland seals)
  • eliminates the need to operate condensate and circulating water systems on overnight shutdown
  • ancillary equipment for gland steam conditioning can be eliminated
  • improves performance margin on auxillary boilers - reduces overall plant power consumption

This 6,575 square-foot condenser serves a 15 MW turbine in a combined cycle facility. The shell is oversized to dissipate the thermal and kinetic energy of the steam dump. The 9'2" x 2'5" isolation damper is integral within the top of the shell.

Yuba Heat Transfer LLC - ECOLAIRE
95 Highland Avenue, Suite 210
Bethlehem, PA 18017
A Division of Connell Limited Partnership
 
610-250-1000
Fax: 610-250-1010
E-mail:
jones@yuba.com

 

 

Go Back to ECOLAIRE Home Page Site Map Links to Other Sites Contact/Request Info Parts & Field Service Revamping & Life Extensions World-Wide Experience Products Engineering & Manufacturing Company Profile Engineering Studies